UK Designed & Manufactured  ·  Patent Pending GB 2600815.1  ·  Download Product Brochure ↗
MW Equipment LTD — Sales Tool

ROI
Calculator.

Enter your site details and see your potential savings instantly. All five MWE products — labour, time and damage savings calculated live. Results update as you type.

5
Products Calculable
Live
Instant Results
£
Real-World Labour Rates
Print
Shareable Output

FuelBag

Portable diesel bowser — labour & time savings from excavator-compatible refuelling

Number of Excavators on Site 10
10

All machines that need regular diesel top-ups (excavators, dumpers, dozers, etc.)

Time Saved per Machine (minutes/day) 20
20

Time saved per machine per day from faster, chainless fuelling with the Easy-Lift System

Operator Labour Rate
Working Days per Year
Machine Hours per Day
FuelBag Retail Price (£)

Adjust if your price differs from RRP

Hours Saved per Day
3.3 hrs
across all machines
Annual Labour Saving
£20,000
labour cost recovered
Payback Period
5.3 mo
months to break even

Savings Breakdown

PeriodTime SavedLabour Saving
Per Day
Per Week
Per Month
Per Year
Return on Investment —%
0%100%200%300%+
✓ No Chains Required ✓ Excavator Compatible ✓ Works on Waterlogged Ground ✓ COSHH / PPG26 Compliant ✓ 2,000L · 80L/min · 8m Hose Reel

WetBag

Site dewatering system — labour savings from reduced operatives and faster pump setup

Applications per Day 1
1

Number of dewatering operations (trench pumping, flooded area drainage) per day

Setup Time Saved per Application (hours)

Minimum 1 hour saved per application on setup vs traditional pumping methods

Labour — Traditional Operatives Required 3
3
Labour — WetBag Operatives Required 1
1
Labour Rate (£/hour)
Machine Hours per Day
Working Days per Year
WetBag Retail Price (£)
Men Saved per Day
2 men
fewer operatives needed
Annual Labour Saving
£38,400
labour cost recovered
Payback Period
2.2 mo
months to break even

Savings Breakdown

PeriodSetup Time SavedLabour Saving
Per Day
Per Week
Per Month
Per Year
Return on Investment —%
0%100%200%300%+
✓ No Mains Power Required ✓ Eliminates Site Hoses ✓ Diesel or Hydraulic Pump ✓ 80% Faster Pumping ✓ Tank + Pump in One Unit

DustBag

Mobile dust suppression — savings from reduced relocation labour vs traditional methods

Relocations per Day 10
10

How many times the dust suppression unit is moved per day on site

Traditional Relocation Time (minutes each)

Time per relocation using traditional tow/manual methods

Traditional Operatives per Relocation
DustBag Operator(s) per Relocation

DustBag relocated by single excavator operator — 85% less labour time

Labour Rate (£/hour)
Working Days per Year
DustBag Retail Price (£)
Labour Hours Saved / Day
9.3 hrs
relocation labour eliminated
Annual Labour Saving
£55,680
labour cost recovered
Payback Period
2.2 mo
months to break even

Time & Labour Breakdown

MethodLabour Hours / DayLabour Cost / Year
Traditional Method
With DustBag
Saving
Return on Investment —%
0%100%200%300%+
✓ 85% Less Relocation Labour ✓ 2,000L Standalone Tank ✓ 30m Throw Distance ✓ No Mains Water Needed ✓ CDM & COSHH Compliant

FenceBag

Heras fencing handler — installation labour, load/unload time and panel damage savings per project

Fence Panels per Project 200
200

Total Heras fence panels to install per project or deployment

Traditional Installation Days

Traditional method: typically 2–3 days for 200 panels with 5 operatives

Traditional Operatives
FenceBag Install Time (hours)

FenceBag: 200 panels installed in 4–6 hours

FenceBag Operatives
Traditional Load/Unload Time (hours)
FenceBag Load/Unload Time (hours)

FenceBag: unloading in ~15 minutes vs 3–4 hours traditionally

Panel Replacement Cost (£ each)
Current Panel Damage Rate (%)

% of panels damaged per deployment under current handling

Labour Rate (£/hour)
FenceBag Retail Price (£)
Total Saving / Project
£3,600
labour + damage combined
Projects to Payback
1.7
projects to break even
Return on Investment
59%
per project ROI

Project Savings Breakdown

Saving CategoryTraditional CostFenceBag CostSaving
Installation Labour
Load / Unload Labour
Panel Damage (50% reduction)
Total Project Saving
Payback Progress 1.7 projects
01 project2 projects3+ projects
✓ 54 Panels per Lift ✓ Unload in 15 Minutes ✓ Reduces MSD Risk ✓ Reduces Panel Damage ✓ Crane & Telehandler Compatible

BarrierBag

Pedestrian barrier handler — deployment speed, labour reduction and damage savings per deployment

Number of Barriers per Deployment 144
144

BarrierBag capacity: up to 144 barriers = approx. 360 metres

Traditional Operatives
BarrierBag Operatives
Traditional Barriers Deployed per Hour

Typical manual deployment rate ~30 barriers/hour

BarrierBag Barriers Deployed per Hour

BarrierBag rate: 60–80 barriers/hour (use 70 as default)

Barrier Replacement Cost (£ each)
Current Damage Rate (%)
Labour Rate (£/hour)
BarrierBag Retail Price (£)
Saving per Deployment
£180
labour + damage
Deployments to Payback
25
deployments to break even
Return on Investment
4%
per deployment ROI

Deployment Savings Breakdown

MethodLabour HoursOperativesLabour Cost
Traditional Method
With BarrierBag
Labour Saved + Damage Saving
Headline Impact 144 barriers
TraditionalBarrierBag
✓ 144 Barriers per Load ✓ 1 Operator vs 3 Traditional ✓ 2× Faster Deployment ✓ Reduces Barrier Damage ✓ Highways & Events Ready
All Products — Combined Overview

Your Savings Summary

Results calculated from your current inputs across all five products. Adjust any calculator above and this table updates automatically.

Product Annual / Project Saving Retail Price Payback ROI Primary Saving Driver
FuelBag
Portable Diesel Bowser
£8,895 Labour saved fuelling excavators
WetBag
Site Dewatering
£6,995 Labour reduction — water pumping
DustBag
Dust Suppression
£10,295 85% less relocation labour
FenceBag
Fencing Handler
£5,995 Install + load labour + panel damage
BarrierBag
Barrier Handler
£4,495 Deployment labour + barrier damage

Estimates are based on user-supplied inputs and industry average assumptions. Labour time savings assume effective use of the MW Easy-Lift System. Damage savings use a 50% reduction assumption. Actual results will vary by site, operator experience, ground conditions and usage pattern. These calculations are indicative only and do not constitute a financial guarantee. Prices shown are current RRP ex-VAT; contact MW Equipment for your specific pricing. Built for industry. By industry. Patent Pending GB 2600815.1.

Satisfied with
the numbers?

Talk to our team. We'll confirm pricing for your specific requirements and discuss lead times for the FuelBag (available now) and coming-soon products.