Coming Soon — Register Interest
Move 54 Fence Panels With One Lift
The FenceBag lifts and transports up to 54 UK-standard Heras security fence panels as a single secure load using your existing excavator, telehandler, forklift or crane. What takes 2–3 days and five operatives traditionally takes 4–6 hours and three. What takes 3–4 hours to unload manually takes 15 minutes. Eliminates repetitive panel-by-panel manual handling — the primary cause of MSDs in construction fencing operations.
Also known as & commonly searched as:
Panel Capacity
54 Heras Panels
Installation (200 panels)
4–6 Hours
Load / Unload
~15 Minutes
Labour Needed
2–3 (vs 5 Traditional)
Moving Heras security fencing is one of the most labour-intensive, time-consuming and physically damaging tasks in construction site logistics. Individual panels are heavy, awkward and sharp-edged — typically handled one by one by multiple operatives in a process that takes days for large deployments and generates a steady stream of musculoskeletal injuries.
The FenceBag changes the model entirely. 54 fence panels in one lift, precisely positioned using the excavator already on site. A multi-day job becomes a half-day job. Five people become three. And the manual handling that injures construction workers is mechanised out of the process.
For fencing contractors, groundworks companies and site managers handling large Heras deployments on construction, infrastructure, events or highways projects, the FenceBag delivers measurable savings from the first project — typically paying back within one to two deployments.
The Manual Handling Problem
52% of all MSDs in construction are directly linked to manual handling — lifting, carrying, pushing and pulling heavy or awkward materials (HSE 2024/25). The repetitive manual handling of Heras fence panels is a textbook example of the task profile that generates these injuries. The FenceBag mechanises it entirely using existing site plant.
By the Numbers — 200 Panels
Installation — Traditional
2–3 Days
5 operatives, manual carrying
Installation — FenceBag
4–6 Hours
2–3 operatives, excavator-assisted
Load/Unload — Traditional
3–4 Hours
5 operatives, manual
Load/Unload — FenceBag
~15 Min
2–3 operatives, excavator-assisted
Carries up to 54 UK-standard Heras security fence panels in a single organised vertical load, secured for lifting by excavator, telehandler, forklift or crane. Precise placement without individual panel handling.
200 panels installed in 4–6 hours instead of 2–3 days. 2–3 operatives instead of 5. Direct labour cost saving from the first project, with payback typically within 1–2 deployments at £5,995 retail price.
Loading and unloading reduced from 3–4 hours with 5 operatives to approximately 15 minutes. This saving applies every time fencing is moved between sites, between storage and installation, or between project phases.
Eliminates the repetitive manual carrying and positioning of individual panels. HSE identifies manual handling of heavy, awkward materials as the leading cause of MSDs in construction — 52% of all MSDs are directly linked to it. The FenceBag mechanises this task with existing plant.
Organised storage and mechanical handling of panels in the FenceBag reduces damage from the dropping, dragging and improper stacking that characterises manual handling methods. Fewer damaged panels means fewer replacement costs per project.
The FenceBag is designed to be stackable, reducing storage space in depots and on site. The removable MW Easy-Lift System lift bar enables stacking when the unit is not in use, making the FenceBag practical for fleet operators with multiple units.
| Panel Capacity & Design | |
|---|---|
| Panel Capacity | Up to 54 UK-standard Heras panels |
| Compatible Panels | UK-standard Heras security fencing |
| Panel Orientation | Vertical — organised, damage-reducing |
| Design | Stackable for depot and site storage |
| Lift Bar | Removable MW Easy-Lift System lift bar |
| Steel Grade | S355 structural steel (BS EN 10025-2) |
| Manufacturing Standard | ISO 9001:2015 & ISO 14001 |
| Performance & Lifting System | |
|---|---|
| Installation Time | 4–6 hours (200 panels) vs 2–3 days traditional |
| Load/Unload Time | ~15 minutes vs 3–4 hours traditional |
| Operatives Required | 2–3 (vs 5 traditional) |
| Lifting System | MW Easy-Lift System (Patent Pending GB 2600815.1) |
| Lifting Pin | 60mm — compatible with 13t+ excavators |
| Compatible Plant | Excavators, forklifts, telehandlers, cranes |
| Availability | Coming soon — register interest |
| Retail Price | £5,995 + VAT (contact for pricing) |
| Factor | Traditional Method | FenceBag |
|---|---|---|
| Installation Time (200 panels) | 2–3 days | 4–6 hours |
| Operatives Required | 5 operatives | 2–3 operatives |
| Load/Unload Time | 3–4 hours, manual | ~15 minutes, excavator-assisted |
| Panel Handling | Individual manual carry — MSD risk | 54 panels per lift — mechanised |
| Panel Damage | High damage from manual handling | Organised stack — reduced damage |
| Storage | Panels stacked manually, takes space | FenceBag stackable — compact storage |
| Plant Required | Labour gang only — no plant needed | Uses excavator / telehandler already on site |
| MHOR Compliance | High manual handling exposure | Mechanised — significantly reduces MHOR risk |
| Project Payback | No capital investment — high recurring cost | Typically 1–2 project payback at £5,995 |
The FenceBag carries up to 54 UK-standard Heras security fence panels in a single secure vertical load. Panels are held organised and damage-reduced during lifting, transport and positioning by excavator, telehandler, forklift or crane.
200 Heras panels can be installed in 4–6 hours with 2–3 operatives using the FenceBag, compared to 2–3 days with 5 operatives using traditional manual methods. The FenceBag lifts and positions batches of up to 54 panels at a time using the site excavator or telehandler, eliminating manual carrying and positioning of individual panels.
Loading and unloading takes approximately 15 minutes with the FenceBag, compared to 3–4 hours using traditional manual methods with 5 operatives. This saving applies every time fencing is moved between sites, from storage to installation position, or between project phases — making the FenceBag valuable long after the first installation.
Yes. The FenceBag eliminates the repetitive manual carrying, lifting and positioning of individual Heras panels — a task identified by HSE as a primary cause of musculoskeletal disorders in construction. 52% of all MSDs in construction are directly linked to manual handling (HSE 2024/25). The FenceBag mechanises fencing logistics with the existing site excavator or telehandler, directly reducing this risk.
The FenceBag's removable MW Easy-Lift System lift bar is compatible with excavators (1t+), counterbalance and telescopic forklifts, telehandlers/loadall, and cranes. No specialist attachments or modifications to existing machinery required. Any machine that can accept a standard 60mm lifting pin can operate the FenceBag.
The FenceBag is currently coming soon. Register your interest using the form on this page or contact us on 01905 935679 / info@mwequipment.co.uk and we will notify you as soon as the FenceBag is available with full specifications and pricing.
The FenceBag is coming soon. Leave your details and we'll be in touch with full specifications, pricing and availability as soon as the product is ready — and we'll keep you updated on development progress.
Register Interest — FenceBag
Register interest or call our team to discuss the FenceBag. We respond within one working day.